Monday, February 1, 2010

Blog 3

Hole drilled in Pressure Vessel Bottom













Displacer Fit into the Pressure Vessel Bottom

















Before Red RTVing the Pressure Vessel Top to the Bottom

















After

















Our method of adding a crossbar to the displacer needle and allowing the JB Weld to dry

















Crossbar JB Welded on

















Leak Test with the hole covered (no leaks)













First Crankshaft support Red RTVed on

















PVC Pipe and Supports Red RTVed on

















Balloon added

















While working on the connectors between the crankshaft and the crossbar, our crankshaft broke so we are currently making a new one.

2nd Blog


Pressure Vessel Top












Displacer













Displacer before JB Weld


















Pressure Vessel Top

Tuesday, January 19, 2010

Blogging Day 1

Pressure Valve Bottom


















Pressure Valve Bottom attached to Ring Stand


















Crankshaft


















Displacer bottom